Titan Loading Chutes:

- Constructed of 2" square tubing heavy duty frame
- Sides are 1 1/2" square tubing covered with 48" 16 gauge sheet metal
- Wooden floor is adjustable to 4 height settings and
has metal cleats for sure footing
- TWI portable chute is equipped to carry 10 portable panels
on each side. You may transport chute and corral all in one unit.
- Options: End gates, Rumber® flooring, catwalks
|
|
Portable Loading Chutes :
12' Portable Loading Chute w/ Wood Floor
Retail $ 2,986 ......Special $ 2,687 + Freight
12' Portable Loading Chute w/ Rumber® Floor
Retail $ 3,526 ......Special $ 3,173 + Freight
Catwalks per Side R $ 309 ....Special $ 278
Chute End Gate R $ 136.... Special $ 122
16' Portable Loading Chute w/ Rumber® Floor
Retail $ 4,359 ......Special $ 3,923 + Freight
Catwalks per Side Retail $ 378.... Special $ 340
Chute End Gate Retail $ 136.... Special $ 122
|
 |
 |
 |

Can Carry up to 20 Portable Panels |
* Prices Plus Freight & Taxes , Prices Subject to Change W/Out Notice*
* Call for Current Specials Equipment FOB Linn, KS * |
 |
 |
14' Stationary Loading Chute
14' Stationary Loading Chute w/ Steel Floor
Retail $ 5,897 ......Special $ 5,307 + Freight
14' Stationary Loading Chute w/ Rumber® Floor
Retail $ 6,358 ......Special $ 5,722 + Freight
All Steel Construction:
- The TWI all steel 14' Loading Chute is constructed of 2" Heavy Duty square tubing
- All steel floor of 1/8" floor plate
- Optional Rumber® flooring
- Steel cleats are spaced every 11" to prevent slipping
- Catwalk on side of chute aids in loading cattle
- Spring loaded bumper on front to match truck, constructed of 1/2" steel plate
|
* Prices Plus Freight & Taxes , Prices Subject to Change W/Out Notice*
* Call for Current Specials Equipment FOB Linn, KS * |

|
16' Permanent Concrete Loading Chute
( Concrete Not Included ) Retail $ 4,703
Special $ 4,232 + Freight
- Sides are 16 gauge sheet steel and 62" tall
- Spring loaded bumper of 1/2" plate steel to match truck bed
- Steps are formed of steel and filled with concrete when base is poured
- Choice of left or right loading ramp or catwalk
|
|